D&N was commissioned to complete a detailed geotechnical investigation for a number of proposed upgrade works for an existing grain storage and loading facility at Cunningar, NSW.
We were subsequently retained during the detailed design phase support refinement of silo/grain elevator piled foundations and optimisation of the rail formation for a new rail siding.
We were engaged during construction to provide piled foundation verification, subgrade assessment and input to site drainage requirements.
Featured projects